Strip-out and making good
Removal of old tubs, cabinetry, vinyl, tiles and damaged sheeting, with floor protection along the access path.
Hard-working utility spaces
Laundry renovations in Brisbane with smart storage, durable wet-area finishes and coordinated plumbing. QBCC licensed builder. Call (07) 8590 6941.
Laundry Renovation across Brisbane. Call (07) 8590 6941 or request an on-site measure and written quote.
Hard-working utility spaces
A laundry works harder than almost any room in the house, and it is usually the last to get attention. We rebuild laundries around the way households actually use them: sorting, washing, drying, folding, storing cleaning equipment and containing mess. That means durable finishes, proper ventilation, a bench that can take a basket, and storage that does not rely on a single overcrowded cupboard.
Many Brisbane laundries were originally a corner of the back verandah or a narrow room beside the kitchen. They often have inadequate waterproofing, poor drainage, no exhaust and a single power point. We bring the room up to a modern standard, coordinate plumbing and electrical, and finish it with materials that tolerate steam and detergent.
Whether you are combining a laundry with a mudroom, upgrading a family laundry in Sunnybank Hills or fitting out a compact apartment laundry in Spring Hill, we handle the full scope: strip-out, cabinetry, benchtop, tiling, plumbing, electrical, ventilation and fit-off.
Every project is different, but the following scope is the foundation we price and manage. Your written quote confirms exactly what applies to your room, including any exclusions and provisional allowances.
Removal of old tubs, cabinetry, vinyl, tiles and damaged sheeting, with floor protection along the access path.
Purpose-built base cabinets, overhead storage, broom cupboards and laminate, engineered stone or stainless benchtops.
Washer, dryer, sink, tapware and appliance clearances planned around door swings and hoses.
New laundry tub, mixer, washing machine taps, floor waste and relocated supply or waste where required.
Splashback and floor preparation, membrane where required, slip-resistant tiles and sealed junctions.
Exhaust fan ducted outside to remove moisture from dryers and washing.
Dedicated circuits, additional power points, task lighting and safe dryer connection.
Shelving, hanging rails, ironing storage and paint touch-ups for a complete room.
Most laundry designs leave nowhere to put a basket or fold clothes. We plan a clear bench zone, a dedicated basket space and storage at working height so the room functions without clutter. If space allows, we incorporate a folding bench over the front-loader.
Dryers and washing produce significant moisture. We duct exhaust outside, avoid recirculating fans, seal penetrations and use finishes that tolerate humidity. This protects cabinetry, paint and the adjoining rooms.
Washing machine taps and hoses should be reachable without moving a machine through a tight gap. We set taps and power points to one side where possible, and use a recessed box for a clean finish.
A laundry that doubles as a mudroom needs durable flooring, hooks, a seat and a clear path from the back door. We help you prioritise storage and circulation so the room earns its space.
Laundry costs are driven by cabinetry, benchtop material and whether plumbing or walls move. These bands assume a standard room with an existing window and door.
| Scope | Indicative range |
|---|---|
| Refresh with new cabinetry and tiles | $10,000 – $16,000 |
| Full rebuild with new plumbing points | $16,000 – $23,000 |
| Custom joinery, stone bench and appliance tower | $23,000 – $32,000 |
| Laundry and mudroom combination | $32,000+ |
Indicative only. Appliance costs, asbestos and room reconfiguration are excluded unless listed in your quote. For a fuller breakdown, read our Brisbane bathroom renovation cost guide or use the cost calculator.
One project lead manages the sequence, checks each trade's work and keeps you informed. The programme is agreed before demolition so you know when to expect each stage.
Tell us the room size, appliances and storage problems you want solved.
We check plumbing, power, ventilation and door clearances, then plan the cabinetry layout.
Itemised scope for demolition, cabinetry, benchtop, tiling, plumbing, electrical and finishing.
Old fittings removed, plumbing and electrical rough-in completed, walls made good.
Cabinetry, bench, tiling, sink, tapware, ventilation and lighting installed.
Appliances tested, surfaces cleaned and care instructions provided.
We are the builder. The team who quotes your project is accountable for the waterproofing, tiling, trade coordination and handover. That direct responsibility is why our scope can be specific and our programme realistic.
If you are comparing quotes, read our guide to choosing a bathroom contractor and our contractor standards so you know what to ask.
We work across Greater Brisbane, including the northside, southside, eastside, westside and inner city. Local housing conditions affect the scope: older Queenslanders may need floor levelling and substrate repair, while apartments need body corporate approval and careful access planning.
Not sure which page applies to you? Call us with your suburb and we will point you to the right local information and confirm service availability.
Practical answers
The questions Brisbane homeowners ask most often about laundry renovation, costs and timing.
Yes, subject to drainage, ventilation and structural considerations. Moving a laundry usually requires new waste and supply lines, an exhaust route and appropriate floor waterproofing. We assess the proposed location before quoting.
Wet-area requirements depend on the fixtures and layout. A laundry with a sink, washing machine and floor waste generally needs a waterproof membrane to the floor and splash zones. We specify it to the relevant standard and document the work.
Yes, if the appliances are designed for stacking and the cabinet or wall can support them. We confirm dimensions and ventilation before finalising the joinery.
Engineered stone is durable and easy to clean, laminate is budget-friendly, and stainless steel suits heavy utility use. We discuss heat, moisture and chemical exposure so the surface suits your household.
Yes. We install drop-in or undermount sinks, laundry tubs, mixer taps and washing machine taps, with drainage configured to prevent pooling and backflow.
Most laundries take 7–12 working days on site. Custom cabinetry and stone fabrication can extend the lead time before installation. We confirm the programme in your quote.
Get started
Call (07) 8590 6941 for a straightforward conversation, or send your details and we will arrange an on-site measure and written quote.