Bathroom renovation cost guide
Realistic planning ranges, the factors that move the price and the questions to ask before you compare quotes. No low headline number, no hidden allowances.
Want a number for your room? Call (07) 8590 6941 or book an on-site measure. We will explain what drives the cost before you commit.
The honest starting point
Bathroom renovation pricing is not a single number. It is the sum of demolition, substrate repair, plumbing, electrical, waterproofing, tiling, joinery, glazing, fixtures, painting and project management. Two bathrooms of the same size can differ by tens of thousands of dollars because one retains the layout and the other moves the toilet, replaces the floor structure and upgrades every finish.
The ranges below are planning guides for Brisbane homes. They assume a licensed builder, a written scope, AS 3740 waterproofing and a normal level of site access. They are not quotes, and they are not a promise that your project will fall inside the band. A site inspection is the only way to price the room you actually have.
| Project type | Typical planning range |
|---|---|
| Full bathroom renovation, existing layout | $18,000 – $30,000 |
| Full bathroom with layout changes | $28,000 – $45,000 |
| Small or compact bathroom renovation | $14,000 – $26,000 |
| Ensuite renovation | $15,000 – $32,000 |
| Laundry renovation | $10,000 – $24,000 |
| Kitchen renovation | $20,000 – $55,000 |
| Bathroom waterproofing only | $2,500 – $4,500 |
| Tiling only, bathroom | $4,000 – $12,000 |
| Accessible bathroom modifications | $12,000 – $30,000 |
| Apartment bathroom with body corporate | $17,000 – $40,000 |
Indicative ranges only. Read the assumptions below and use the cost calculator for an interactive estimate.
Tiling area is often more important than floor area. A small bathroom with full-height wall tiles, a shower niche and a mitred feature wall can involve more tiling than a larger room with a standard splashback. Waterproofing area, screeding, adhesive and labour all scale with the surfaces being prepared and finished.
Keeping the toilet, shower and vanity in their existing positions is the single biggest cost saver. Moving a waste or supply line depends on joist direction, fall, stack access and whether the floor is timber or slab. A layout change can add plumbing, carpentry, waterproofing and tiling work, and it may require building approval or body corporate consent.
Older Brisbane bathrooms frequently hide water damage. Failed sheeting, rotting studs, compromised floor boards, illegal past work and undersized exhaust ducting are common. We cannot see all of it until the room is opened, which is why a provisional allowance is more honest than a fixed price that ignores the risk. We photograph the damage and agree the repair before proceeding.
Entry-level porcelain, a framed screen and a standard vanity cost far less than large-format rectified tiles, a frameless screen, stone tops, wall-hung joinery, brushed nickel tapware and niche lighting. The labour to install premium finishes is often higher because tolerances are tighter and the details take longer.
A like-for-like replacement of tapware and fixtures is straightforward. New circuits, heated towel rails, underfloor heating, exhaust ducting through a roof space, three-in-one bathroom units and relocated lighting add design, labour and compliance work. Electrical and plumbing must be completed by licensed trades and documented.
Ground-floor homes with a driveway are the simplest. Apartments add body corporate approvals, lift bookings, protection of common areas, parking permits and restricted work hours. Queenslanders on steep blocks may need extra staging, waste removal planning and structural investigation. These costs are real and should be visible in the quote.
Brisbane's humidity makes ventilation a functional requirement, not an optional extra. An externally ducted exhaust fan sized for the room, with a quality backdraft shutter and a clean duct run, costs more than a ceiling-mounted recirculating unit. It also protects the building from condensation and mould, which is far more expensive to remediate later.
Tiles, tapware, vanities, screens and custom joinery can have lead times of several weeks. If a project is rushed, the wrong product may be substituted or the programme may stall. We confirm lead times before demolition and build realistic cure times into the schedule. A fast programme that ignores waterproofing cure is not a saving.
The exact split depends on the scope, but a full bathroom renovation generally follows a pattern. This is a useful sanity check when a quote looks unusually low in one area and unusually high in another.
| Cost category | Share of budget | What it covers |
|---|---|---|
| Labour and project management | 30–40% | Site coordination, carpentry, supervision, scheduling and quality checks |
| Tiling and screeding | 15–20% | Substrate preparation, screed, wall and floor tiles, grout and silicone |
| Waterproofing | 4–7% | Membrane, preparation, flood testing and certification |
| Plumbing and electrical | 10–15% | Rough-in, fit-off, exhaust, lighting and compliance certificates |
| Joinery and fixtures | 15–25% | Vanity, tapware, toilet, shower, screen, mirror and accessories |
| Demolition and waste | 3–6% | Strip-out, protection, skip hire and disposal |
| Contingency | 10–15% | Hidden damage, provisional items and client changes |
Existing layout, standard porcelain tiles, framed or semi-frameless screen, entry-level vanity and tapware. The priority is waterproofing and function.
Full rebuild, minor plumbing moves, large-format tiles, wall-hung vanity, frameless screen and better ventilation.
Reconfigured layout, custom joinery, stone tops, feature tiling, niche lighting and premium tapware.
Structural change, freestanding bath, imported stone, underfloor heating, smart systems and bespoke detailing.
Do not compare totals in isolation. Put the quotes side by side and check whether each one includes the same scope. A quote that is $5,000 cheaper may simply exclude waterproofing, screeding, the shower screen or waste removal. Those items still have to be paid for, usually after you have committed.
| Check | What a complete quote shows |
|---|---|
| Demolition and disposal | Protection, strip-out, skip hire and tip fees |
| Substrate | Inspection findings, sheeting replacement and provisional allowances |
| Waterproofing | AS 3740 system, flood test and certificate |
| Tiling | Areas, tile supply or allowance, screed, grout and silicone |
| Plumbing and electrical | Rough-in, fit-off, exhaust, lighting and certificates |
| Fixtures | Vanity, tapware, toilet, screen, mirror and accessories, or clear allowances |
| Painting and make-good | Ceiling, cornice, doors, architraves and patch work |
| Programme and payment | Start date, milestones, cure times and progress payment schedule |
| Variations | How hidden damage and client changes are priced and approved |
| Warranty | Workmanship terms, statutory warranties and certificate handover |
You can save by retaining the layout, choosing standard-size tiles, buying a quality off-the-shelf vanity, limiting niche and feature work, and renovating the bathroom and laundry together to reduce mobilisation. You can also save by supplying your own fixtures if you accept the lead-time and warranty risk.
Do not save on waterproofing, substrate preparation, ventilation, plumbing and electrical compliance, or the quality of the shower screen and tapware cartridges. These are the parts that cause failures, insurance disputes and repeat work. A cheap membrane or an undersized fan is not a bargain.
Queensland domestic building work is governed by a written contract that sets out the scope, price, payment stages, variations and completion process. We do not ask for large cash deposits or payments unrelated to progress. If your project requires QBCC home warranty insurance, we will explain whether it applies and how it is arranged before work starts.
Read the contract before you sign it. Check the licence name and number, the scope, the allowances, the exclusions and the process for resolving a dispute. A professional builder will not rush you through this step.
The ranges on this page are useful for planning, but they cannot account for the condition of your substrate, the access to your property or the finishes you have in mind. An on-site measure takes about an hour and gives you a written scope you can compare properly. Call us or request a quote and we will arrange a time.
Budget answers
What Brisbane homeowners ask about quotes, inclusions, contingencies and payments.
A typical full bathroom renovation in Brisbane ranges from about $18,000 to $45,000, with most projects landing between $24,000 and $36,000. Compact ensuites and small bathrooms generally start lower, while layout changes, premium finishes, structural repairs and apartment access can push the price higher. The only reliable number comes from an on-site inspection and a written scope.
Quotes differ because the scope differs. One price may exclude waterproofing, screeding, waste removal, exhaust ducting, shower screens, tapware, painting or make-good. Another may assume the substrate is sound without inspecting it. Compare the inclusions line by line, not just the total. A low price with missing items is not a lower price; it is an incomplete scope.
Common exclusions include asbestos testing and removal, structural repairs, major plumbing relocations, body corporate fees, building approvals, temporary bathroom hire, custom joinery beyond the allowance, premium tile and tapware upgrades, and landscaping or external make-good. A good quote lists these clearly rather than leaving them to become surprise variations.
For an older Brisbane home, we recommend keeping 10 to 15 percent of the contract value as a contingency. Bathrooms hide water damage, failed sheeting and illegal past work. A contingency is not a slush fund; it is a buffer for genuine hidden conditions that could not be identified before demolition.
Only if the scope is complete and the waterproofing is done properly. A cheap renovation that skips membrane preparation, uses inadequate ventilation or tiles over a failed substrate will cost more to fix later. Focus on value: a clear scope, licensed trades, tested waterproofing and a realistic programme. Those are the parts you cannot see but will live with every day.
Yes, wherever the scope can be defined. We provide an itemised fixed price for the known work and transparent provisional allowances for conditions that cannot be confirmed until demolition. If a provisional item changes, we document it, explain the options and agree the variation in writing before proceeding.
Payments are linked to progress, not to arbitrary dates. A typical schedule includes a deposit, a progress payment after rough-in and waterproofing, a payment after tiling, and the balance at practical completion. The exact schedule is set out in your contract and complies with Queensland requirements for domestic building work.
Sometimes. We are happy to work with client-supplied products, provided they are suitable, available and compliant. You carry the risk of lead times, damage, shortages and warranty claims on those items. We confirm quantities, spares and compatibility before ordering, and we do not inflate trade prices to recover a margin.