Strip-out and disposal
Removal of tiles, screens, vanity, toilet, bath, shower, sheeting and affected framing. Floor protection, dust containment and skip placement are planned before day one.
Complete wet-area rebuilds
Complete bathroom renovations in Brisbane by a QBCC licensed builder. Strip-out, waterproofing, tiling, plumbing and fit-off by one team. Call (07) 8590 6941.
Full Bathroom Renovation across Brisbane. Call (07) 8590 6941 or request an on-site measure and written quote.
Complete wet-area rebuilds
A full bathroom renovation replaces everything you can see and everything you cannot. We strip the room back to framing, inspect the substrate, rebuild the wet-area layers, waterproof to AS 3740, tile, install fixtures and hand the room back ready to use. One team coordinates the demolition, plumbing, electrical, waterproofing, tiling and fit-off so you are not left chasing separate trades.
Most Brisbane homes we work on were built between the 1950s and 1990s. That means we regularly find failed sheeting, tired pipework, undersized exhaust fans and waterproofing that was never documented. Our written scope starts with a site inspection and a moisture check, then sets out exactly what will be replaced, what can be retained and how variations will be priced.
Whether you are updating a family bathroom in Chermside, reworking an ensuite in Coorparoo or preparing an apartment in Spring Hill for sale, the process is the same: a fixed written scope, a realistic programme, one point of contact and a formal handover with your waterproofing certificate.
Every project is different, but the following scope is the foundation we price and manage. Your written quote confirms exactly what applies to your room, including any exclusions and provisional allowances.
Removal of tiles, screens, vanity, toilet, bath, shower, sheeting and affected framing. Floor protection, dust containment and skip placement are planned before day one.
Replacement of water-damaged studs, noggings, floor sheeting and rotting timbers. We document hidden damage with photos before rectification.
Licensed plumbing for new wastes, relocated supplies, mixer heights, floor waste falls and shower drainage. Existing stacks are reused where practical to control cost.
Sheet preparation, bond breakers, fillets, two-coat membrane application and flood testing. We supply a waterproofing compliance certificate at completion.
Level, set-out, screeding, niche detailing, mitred edges, epoxy grout where specified and silicone to all wet junctions.
Vanity, basin, tapware, toilet, shower screen, mirror, accessories, exhaust fan and lighting installed and tested.
Ceiling repairs, cornice patching, door and architrave preparation, and low-sheen bathroom paint to finish the room.
Builders clean, rubbish removal, a walkthrough of every fixture, care instructions and your documentation pack.
A bathroom quote is only useful if it reflects the actual condition of your room. We inspect the substrate, test for moisture, check the exhaust path and confirm plumbing access before we commit to a fixed price. If something is genuinely unknown until demolition, we say so and set a transparent provisional allowance rather than hiding it.
Moving a toilet, vanity or shower looks simple on a plan but depends on joist direction, waste fall and stack position. We work through those constraints with you early so the finished room has proper clearances, a comfortable shower and drainage that will not pool.
You receive a milestone schedule showing when demolition, rough-in, waterproofing, tiling and fit-off happen. Our project lead is contactable across the build, and we confirm each week what is happening next so you can plan around school runs, work and family life.
At completion we test every tap, waste and fan with you, check falls and silicone lines, explain how to care for the finishes, and hand over the waterproofing certificate and warranty information. We do not consider the job finished until you have had the chance to inspect it properly.
Full renovations vary with room size, layout changes and finish level. These bands are a planning guide for Brisbane homes, not a quote. We confirm a fixed price after an on-site measure.
| Scope | Indicative range |
|---|---|
| Essential full renovation, existing layout | $18,000 – $26,000 |
| Mid-range with minor plumbing moves | $26,000 – $36,000 |
| Custom layout, stone and premium tapware | $36,000 – $50,000 |
| Major structural change or luxury fit-out | $50,000+ |
Indicative only. Site access, asbestos, substrate condition, tile selection and body corporate requirements can change the final scope. For a fuller breakdown, read our Brisbane bathroom renovation cost guide or use the cost calculator.
One project lead manages the sequence, checks each trade's work and keeps you informed. The programme is agreed before demolition so you know when to expect each stage.
Tell us the room, your timing and what is not working. We book an on-site measure, usually within a few business days.
We inspect the substrate, plumbing and ventilation, then prepare an itemised written quote with allowances and exclusions shown.
You choose tiles, tapware and fixtures with our guidance. We confirm lead times and lock in the build dates.
The room is protected, stripped and inspected. Plumbing and electrical rough-in are completed and any hidden damage is documented.
Membrane is applied and tested, tiling is set out and finished, then fixtures, screens and accessories are installed.
We clean, walk you through the room, test everything and hand over certificates, warranties and care notes.
We are the builder. The team who quotes your project is accountable for the waterproofing, tiling, trade coordination and handover. That direct responsibility is why our scope can be specific and our programme realistic.
If you are comparing quotes, read our guide to choosing a bathroom contractor and our contractor standards so you know what to ask.
We work across Greater Brisbane, including the northside, southside, eastside, westside and inner city. Local housing conditions affect the scope: older Queenslanders may need floor levelling and substrate repair, while apartments need body corporate approval and careful access planning.
Not sure which page applies to you? Call us with your suburb and we will point you to the right local information and confirm service availability.
Practical answers
The questions Brisbane homeowners ask most often about full bathroom renovation, costs and timing.
Most full renovations take 10–15 working days on site after demolition. Allow additional time for tile and fixture lead times, waterproofing cure and any structural repairs found during strip-out. We provide a milestone schedule before work starts.
Usually not, provided your home has another bathroom or toilet. We maintain dust containment, protect floors and clean daily. If you have a single bathroom, we can discuss a temporary arrangement and sequence the work to shorten the period without a usable toilet.
Yes. We can relocate vanities, toilets, showers and basins, subject to joist direction, waste fall and stack access. Layout changes require plumbing and sometimes structural work, so they are priced after inspection rather than assumed.
You receive a waterproofing compliance certificate covering the wet areas, along with product information and our workmanship warranty. The membrane is applied by a licensed waterproofer to AS 3740 and inspected before tiling.
Homes built before the late 1980s can contain asbestos in sheeting, adhesives or lagging. If we suspect it, we stop, arrange testing and use a licensed removal contractor before work continues. This is a legitimate variation, not a hidden extra.
We can supply through our trade suppliers or work with your selections. Either way, we confirm quantities, lead times and spares before ordering so the programme is not held up by a missing box of tiles.
Get started
Call (07) 8590 6941 for a straightforward conversation, or send your details and we will arrange an on-site measure and written quote.